T molding should be installed directly in the center of a doorway threshold where two rooms or hallways with flooring of the exact same height meet. The vertical stem of the "T" shape fits down into the expansion gap left between the two flooring surfaces, while the wide top flanges rest evenly on top of both floors to bridge the seam seamlessly. Placing it precisely under the closed door ensures that when the door is shut, the transition molding remains completely hidden from view on both sides, creating a clean, professional finish.
1 votes
Marked as accepted