Whether you have to wait for thread sealant to dry before turning on water or gas pressure depends entirely on the specific formula used. Traditional soft-set pipe dopes remain pliable and can often be pressurized almost immediately or within a short window depending on manufacturer guidelines. In contrast, anaerobic thread sealants and curing pipe pastes typically require anywhere from 24 to 72 hours to achieve a full, maximum-strength cure, especially in low temperatures or airtight metal joints. Always consult the specific product instructions and technical data sheets before turning water or gas pressure back on after applying a thread sealing compound.
1 votes
Marked as accepted